TEMPORARY STRUCTURE - Practice Mode
1) Which method of shut piles are driven in the ground and therefore the bearing B.C of soil is increased?
Correct Answer: Continuing soil method
2) Which method of improving B.C of soil is useful for bearing stratum is met at greater depth?
Correct Answer: Grouting method
3) Which method of Soil exploration is suitable for testing cohesion less soil?
Correct Answer: Sub surface sounding method
4) Which method determining bearing capacity of soil by Rankine s formula?
Correct Answer: Analytical method