1) Which camber is provided for earth roads?
1 in 25 to 1 in 30
1 in 20 to 1 in 25
1 in 5 to 1 in 20
1 in 5 to 1 in 10
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: 1 in 20 to 1 in 25
Question Details
1) Which camber is provided for earth roads?
1 in 25 to 1 in 30
1 in 20 to 1 in 25
1 in 5 to 1 in 20
1 in 5 to 1 in 10
2) Which is the direction of rolling in highway construction?
Sides and proceeds to centre
Centre and proceeds to sides
Centre only
One side and proceed to other
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: Sides and proceeds to centre
Question Details
2) Which is the direction of rolling in highway construction?
Sides and proceeds to centre
Centre and proceeds to sides
Centre only
One side and proceed to other
3) Which is an advantage of cement concrete pavement?
Initial coat is low
Tractive resistance is low
Rolling resistance is high
Less time for construction
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: Tractive resistance is low
Question Details
3) Which is an advantage of cement concrete pavement?
Initial coat is low
Tractive resistance is low
Rolling resistance is high
Less time for construction
4) What is the another name of continuous bay method?
Alternate
Strip
Expansion
Traverse
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: Strip
Question Details
4) What is the another name of continuous bay method?
Alternate