MATERIALS USED FOR RCC AND TESTS - Practice Mode
2) Which of the following method is used for super structure component?
Correct Answer: Volumetric or modular construction
3) Which of the following option is taken, if the phone line system will be jammed after earth quake?
Correct Answer: Text messages
4) Which of the following operation need to be done during earthquake?
Correct Answer: Cover and hold on under a desk/table
5) What will be the compressive strength of 15cm cube after 28 days for a ordinary concrete of grade M30?
Correct Answer: 30 N/mm<sup>2</sup>