ITI MCQ
Home
FLOOR - Quiz
Categories
Draughtsman (Civil)
FLOOR
1) Which floor do not require form work during construction?
Precast concrete floor
Double flange stone floor
Jack arch floor
Filler joist floor
2) What is the proportion of lean cement concrete used in cement concrete floor?
01:01:02
01:05.5
01:02:04
01:03:06
3) Which floor wax is applied as a final coat of polishing to get glossy surface?
Mosaic floor
Terrazzo floor
Flagstone floor
Granolithic floor
4) Which floor with a concrete base is spread and levelled with 5 to 8 cm thick lime-surkhi mortar?
Terrazzo floor
Granolithic floor
Mosaic floor
Flagstone
5) Which floor is used for surface subjected to heavy wear like dairies and hospital?
Granolithic floor
Asphalt floor
Terrazzo floor
Cement concrete floor
Submit Quiz