1) Which estimate is prepared while the expenditure on a work exceeds by more than 10%?
Supplementary
Revised
Annual repair
Cubical content
2) Which estimate is prepared while the original sanctioned estimate is exceeded by more than 5%?
Supplementary
Extension and improvement
Revised
Plinth area
3) Which estimate is required for administrative sanction?
Approximate
Detailed
Revised
Supplementary
4) How aggregate is specified?
Size in mm
Length in mm
Height and breadth in cm
Length in m, section in mm
5) Which brick wall thickness is measured in sq.m?
10 cm
15 cm
20 cm
30 cm