1) What is the unit for ridges, valleys, gutters in M.K.S system?
metre
sq.m
cu.m
Nos.
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: metre
Question Details
1) What is the unit for ridges, valleys, gutters in M.K.S system?
metre
sq.m
cu.m
Nos.
2) What is the unit for flooring in MKS system?
m
sq.m
cu.m
Nos.
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: sq.m
Question Details
2) What is the unit for flooring in MKS system?
m
sq.m
cu.m
Nos.
3) What is the minimum lead for earth work excavation?
10 m
20 m
30 m
50 m
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: 30 m
Question Details
3) What is the minimum lead for earth work excavation?
10 m
20 m
30 m
50 m
4) What is the minimum lift for earthwork excavation?
1 m
1.5 m
2.0 m
3.0 m
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: 1.5 m
Question Details
4) What is the minimum lift for earthwork excavation?
1 m
1.5 m
2.0 m
3.0 m
5) What is the measuring unit for soling layer?
m
sq.m
cu.m
Nos.
Show Answer
Report Question
What's wrong with this question?
Report
Correct Answer: sq.m
Question Details
5) What is the measuring unit for soling layer?
m
sq.m
cu.m
Nos.