ITI MCQ
Home
ESTIMATION AND COSTING - Quiz
Categories
WorkShop Calculation and Science
ESTIMATION AND COSTING
1) Who prepares the cost of estimation?
Operator
Quality Inspector
Estimator
Draughts man
2) Which one is included in machining estimation sheet?
Transport cost
Advertisement cost
Raw material cost
Tax
3) What is the minimum permissible size of aluminium wire used in estimation?
1.5 sq.mm
2.5 sq.mm
5 sq.mm
3.5 sq.mm
4) What is the minimum permissible area of conductor (U/G cable) for three and half cores cable?
25 sq.mm
50 sq.mm
5 sq.mm
100 sq.mm
5) Which one is the most reliable estimate?
Preliminary estimate
Plinth area estimate
Cube rate estimate
Detailed estimate
Submit Quiz