1) Which instrument indicates the correct floor level to install package unit?
Correct Answer: Sprit level
2) Where to assemble all the controls, microprocessor display board and indicating LED in package AC?
Correct Answer: Panel board
3) What is the minimum temperature difference in water required between inlet and outlet of water cooled condenser?
Correct Answer: 5 Degree Centigrade
5) How much cut out point is set in high pressure control in package AC using R-22?
Correct Answer: 20 kg/cm<sup>2</sup>